Back to all spots
Junction
Forecast-ready spotNo ratings yetBe first
Junction
Spot Info
Spot Details
PPG friendly
Not marked
Authorization
Not marked
Club / contract
Required
Launch faces
ENE, E, ESE
Forecast point
Ready
Access notes
CUASA and USHPA membership are required. Use the current access and the published bailout LZ; obtain local knowledge for the narrow morning window.
Site rules
- P3 minimum
- CUASA and USHPA membership required
- Use the published bailout LZ
- Do not launch into lee-side or developed thermic conditions
Launch directions
ENE, E, ESE
Direction notes
Ideal 80-105 degrees; acceptable 65-105.
Safety notes
- Early-morning site
- Lee and rotor hazard as valley flow changes
- Restricted bailout planning
- Remote high-desert retrieval
Additional notes
Current CUASA page updated 2 December 2025; OSM and official event waypoint corroborate the exact launch.
Map pin (exact launch)
OSM geometry and the current CUASA/Red Rocks waypoint resolve the Junction launch.
Navigation warning
Use the current CUASA site guide and published bailout LZ; this early-morning east face becomes hazardous in lee/thermal conditions.
Official website
https://www.cuasa.com/junction/Reviews
Pilot Experiences
See who rated this spot and which field-condition bubbles pilots selected.
No ratings yetBe first
Review This SpotNo reviews are visible yet. Share the first rating or field note for this spot.
Spot Group
Posting unlocks with an account
You can draft here and preview the composer. Create a Free Account when you are ready to share a post, upload media, or log a flight update. Create Free Account.
No group posts from this spot yet.
Airspace status